The Baixo Sabor hydroelectric power plant (BSHP), which is currently under construction on the Sabor river, a tributary of the right bank of the Douro river, is a key project for controlling the national Douro River catchment area, with particular strategic importance to the management of the downstream plant cascade in the Douro River. This EDP undertaking was awarded to the consortium Baixo Sabor ACE formed by Bento Pedroso Construções S.A. (subsidiary of the ODEBRECHT group) and Lena Engenharia e Construções on the 30th June 2008.

Location
The BSHP is located in the Trás-os-Montes region, in the lower course of the Sabor River, the first tributary of the right bank of the Douro River in Portugal. In administrative terms, it is located in the municipality of Torre de Moncorvo in the parishes of Larinho and Torre de Moncorvo, the reservoirs stretching through the municipalities of Alfândega da Fé, Macedo de Cavaleiros, Mogadouro and Torre de Moncorvo.
The source of the Sabor River is in Serra de Parada, in Spain, at about 1600 metres altitude. The river then crosses the border within the Montesinho Natural Park and flows through very deep valleys for a little over 120 km until it reaches the Douro River downstream of Pocinho, at an altitude of 97 metres. Approximately 86% of the catchment area is located within Portugal.

Sabor River catchment area
Upstream facility Plan
The upstream facility is the most relevant and visible section of the BSHP. Located approximately 13 km from the mouth of the Sabor, it includes the dam itself, the powerhouse, and the corresponding hydraulic circuits.
The dam is a double curvature arch dam that reaches a maximum height of 123 m above foundation level and is 39 m thick at the base. The crest, standing at of 236 m above sea level (asl), is 505 m long and 6m wide. The safety devices of the dam include a spillway, a bottom outlet, as well as an observation and command centre.

Upstream facility Plan

Upstream facility under construction Mar 2012

Upstream facility under construction Mar 2012
The powerhouse is a shaft type located on the right bank and houses two reversible generators of 70 MW each.
Water is conveyed by two independent hydraulic circuits drilled through the rock mass layer on the right bank.
The dam will also serve as pathway for a new road along the crest that will grant much more convenient and faster access to the county sea to the inhabitants of Adeganha and Cardanha.
Downstream facility Plan
The downstream facility, which is located 3 km from the mouth, consists of a gravity dam with a maximum height of 45 m with a gate controlled spillway in the mid section and a shaft power station, located on the right bank, equipped with two reversible generators of 15 MW each, fed by two independent underground hydraulic circuits. It is also equipped with an observation and command centre. In July 2011, the downstream facility witnessed another breakthrough in Portuguese engineering as one of the blocks was poured using the Preplaced Aggregate Technology Concrete (PAC) technique, the first time it was used for a permanent structure.

Downstream facility Plan

Water intake
Used Products
CEM I 42,5 RLocation
Lower section of the river Sabor
569 M€
Total investment
1.102.240